Login   /  
中国页 Página brasileira Página española                                Facebook page  YouTube channel  Flickr images
Search
 

 Arrow Patients and Carers
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  
 Arrow Medical Professionals
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  

 

“The Bladder Control System gave my life back to me”Amanda Boxtel
 
“My bladder does not dominate my life anymore”.
Jo Wright
 
“I can’t remember when I last had a UTI” Lesley
 
"The number of infections that I have had since implanting this device can be counted on the fingers of one hand" Martin

 

EU Framework 6 - Healthy Aims Project

Healthy Aims Project 

Healthy Aims - The Project

Healthy Aims was a European Union Framework Package 6 project (FP6) involving 26 partners, including 6 SMEs, from across 9 EU countries.  €16M of the €26M project fund was secured from the IST Microsystem programme.  The project ran for 4.5 years and combined experts from a wide range of disciplines.  Click here for Healthy Aims - Key Facts

Healthy Aims - Finetech Medical's Outcomes

The core outcomes for Finetech Medical were:

  • conception, development, ethical approval and completion of initial clinical trials of the STIMuGRIP ® system.  Read more about the STIMuGRIP ® development.
  • development and support of SPIDER, a novel implantable electrode array, trialled in Poland, for pelvic neuromodulation to control bladder and bowel functions.
  • furthered experience of managing all project partners ethical approval applications and clinical trials.

Healthy Aims - Dissemination (Papers, Reports, Presentations)

Dissemination from the Healthy Aims project was extensive.  A selection of dissemination is presented below by category:

 

 Print  
 Latest from Blog
Finetech Medical exhibits at the INS 12th World Congress, Montreal Canada by Jack Spensley
International Knowledge Exchange of SDAF-SARS Conference by Newsroom

Finetech Medical attends an International Knowledge Exchange conference on SDAF-SARS in China

Sir Phillip Craven MBE talks to Finetech Medical about his life and his experiences with the Bladder Control System by Newsroom

Sir Philip Craven- current President of the International Paralympic Committee (IPC)Sir Philip Craven talks about his Bladder Control System “Without the Finetech-Brindley system I would have had to work from home and Presidents should not do that.”

EU Framework 7 - NEUWalk      |      EU Framework 6 - Healthy Aims Project      |      EU Framework 5 - TUBA Project      |      IMPULSE (M181)      |      IMPULSE (E!2526)      |      MedLINK P192      |      Urge incontinence treatment
Copyright © 2008 Finetech Medical. All rights reserved. Website maintained by  Finetech Medical