Login   /  
中国页 Página brasileira Página española                                Facebook page  YouTube channel  Flickr images
Search
 

 Arrow Patients and Carers
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  
 Arrow Medical Professionals
    DiamondSpinal Injuries  
  Dotted line  
    DiamondStrokes  
  Dotted line  
    DiamondMultiple Sclerosis  
  Dotted line  

 

“The Bladder Control System gave my life back to me”Amanda Boxtel
 
“My bladder does not dominate my life anymore”.
Jo Wright
 
“I can’t remember when I last had a UTI” Lesley
 
"The number of infections that I have had since implanting this device can be counted on the fingers of one hand" Martin

 

EU Framework 6- Healthy Aims - Further Information

Healthy Aims Logo

For Key Facts click here.

Overall objectives:
  • Develop a range of medical implants and diagnostic equipment to help the ageing population and those with disabilities.  It has been estimated that around 50% of the western population, some 500 million people, are affected by at least one of the health problems targeted in this project.
Our objectives:
  • Design, develop, test, trial and approve a novel implantable upper limb muscle stimulator
  • Manage the Functional Electrical Stimulation (FES) work package
Our achievements:
  • Succesfully trialled the STIMuGRIP® system - restores control of the wrist and hand grasp action to the user following spinal cord injury, a stroke, the onset of MS or other neurological injury.
    • ideas and research
      • determining application
      • establishing control method
      • determining specification
    • research and prototyping
      • development of implant (epimysial electrode and implantable inductively coupled receiver)
      • development of external unit (controller and accelerometer trigger)
    • testing
      • suite of tests covering:
        • medical device directive
        • electrical safety standards
        • biocompatability standards
        • sterilisation standards
        • packaging
        • risk managment
    • approvals
      • ethical approval
      • clinical protocol
      • clinical trial and associated insurance
      • clinical review
  • Developed:
    • implantable epimysial electrode
      • constructed of a platinum button electrode embedded within silicone rubber
    • implantable inductively coupled receiver (stimulator)
      • 2 independent channel, inductively coupled, implant receiver
      • significantly reduced crosstalk between channels
    • epimysial surgical probe
      • surgical probe incorporating the epimysial electrodes for use when implanting the device
    • surgical stimulator
      • new stimulator design capable of both variable frequency stimulation and variable pulse width stimulation
      • improved range of stimulation parameters
    • wireless charger
      • demonstrated that wireless charging of implants with implanted lithium-ion batteries was feasible
  • Managed the Functional Electrical Stimulation (FES) work package - presentations, progress reports, financial reports.
  • Managed ethical approval applications and clinical trial applications for entire project.
Papers and publicity

Papers and publicity associated with Finetech Medical:

Papers and publicity associated with the overall project:

  • Healthy Aims video
Project information:
  • European Union Framework Package VI project.
  • 26 partners, including 6 SME's, across 9 EU countries.
  • Funded under the IST Microsystem programme.
  • €26 million project fund
 Print  
 Latest from Blog
Finetech Medical exhibits at the INS 12th World Congress, Montreal Canada by Jack Spensley
International Knowledge Exchange of SDAF-SARS Conference by Newsroom

Finetech Medical attends an International Knowledge Exchange conference on SDAF-SARS in China

Sir Phillip Craven MBE talks to Finetech Medical about his life and his experiences with the Bladder Control System by Newsroom

Sir Philip Craven- current President of the International Paralympic Committee (IPC)Sir Philip Craven talks about his Bladder Control System “Without the Finetech-Brindley system I would have had to work from home and Presidents should not do that.”

EU Framework 6- Healthy Aims-STIMuGRIP development | EU Framework 6 - Healthy Aims - Key facts | EU Framework 6- Healthy Aims - Further Information
Copyright © 2008 Finetech Medical. All rights reserved. Website maintained by  Finetech Medical